|
Australia - 29/07/04 BHP Billiton – Mt Arthur Coal SGS works with BHP Billiton at a number of their sites across Australia. The issue is how to effectively manage access and site safety with multiple contractors at all times. The most recent installation was at their Mt Arthur Coal site in February 2003. This is a typical example of a busy site, which requires 24hour/7day access by over 1500 contractors and staff. There are multiple access areas, in this case a main reception centre or two other “muster “ points onsite. Read More |
| Results 1 - 2 of 2 |
| 29/07/04 | Systems and Services Certification | BHP Billiton – Mt Arthur Coal SGS works with BHP Billiton at a number of their sites across Australia. The issue is how to effectively manage access and site safety with multiple contractors at all times. The most recent installation was at their Mt Arthur Coal site in February 2003. This is a typical example of a busy site, which requires 24hour/7day access by over 1500 contractors and staff. There are multiple access areas, in this case a main reception centre or two other “muster “ points onsite. | ||
| 11/17/03 | Minerals | Onshore Oil Production - Australia SGS Expertest, suppliers of Well Testing, Wireline and Production Services to Perth Basin and Cooper Basin Oil and Gas Operators. | ||