Home  > Our Clients :  Client References

Client References


France - 07/20/09
SGS Industrial Services Carries Out Gamma Radiation Control of Brake Disks for the Rail Industry

SGS Industrial Services has been in charge of brake disk testing for IBRE since 1988, carrying out Gamma Radiation Control with Cobalt-60 for their brake disks.

The success of this partnership is founded on highly accurate detection and failure analysis methods, as well as on the very quick work of SGS, as the production of brake disks is on hold during the inspection process.

On a regular basis, 2 - 3 out of 20 brake disk samples are sent to SGS Industrial Services in order to be tested for defects. The SGS team uses Radiographic Testing to detect imperfections. The team of SGS experts is able to identify defects as well as deduce their causes.

Working for more than 20 years for IBRE shows that the company is very pleased with the work of SGS. With SGS’s quick and reliable work, IBRE is able to maintain production quality.

For more details about this project, read the Case Study: Gamma Radiation Control of Brake Disks for the Rail Industry.
Country: or Select Business:

Results 1 - 10 of 45

11/20/09 Industrial Long Range Ultrasonic Testing of Risers for Chevron Nigeria
SGS provides Long Range Ultrasonic Testing of risers for Chevron Nigeria, one of the world’s largest energy companies. This new inspection method can be applied for critical pipe work, risers under clamps, insulated or even buried pipes in operation, enabling Chevron to check the condition of the risers without removing the clamps and schedule shutdown for repairs.
10/07/09 Industrial Owner’s Representative Services for RWE Innogy Wind Farm Project in Poland
SGS Poland provided Owner’s Representative Services for RWE Innogy GmbH during the construction of its first wind farm in Poland, consisting of 18 wind turbines of type SWT-2.3-93.
10/07/09 Industrial Project Verification Services for the Princess Amalia Offshore Wind Farm in the Netherlands
SGS provided project verification services to Van Oord Dredging and Marine Contractors, the Engineering, Procurement, Construction (EPC) contractor of the Princess Amalia Offshore Wind Farm, for over one and a half years.
10/06/09 Industrial Inspection and Project Supervision for the Expansion of Bharat Aluminum Co Ltd in India
SGS experts were asked to provide independent inspection and project supervision of a CHF 30.6 million project that involved the expansion of a 540 MW captive power plant (4x135MW) and related facilities for Bharat Aluminum Co Ltd (Balco) located in the Korba district, Chhattisgarh State, India.
09/11/09 Industrial Supervision of Retrofitting Works for the La Rovira Tunnel in Barcelona, Spain
At the beginning of 2007, the local infrastructure authority of Barcelona, Barcelona d’Infraestructures Municipals (BIMSA), decided to invest over EUR 2 Million for the retrofitting of the installations in the La Rovira Tunnel. The six-month long project focused on upgrading the signalization and accident detection systems of the 1.3 km long, double lane tunnel.
09/07/09 Industrial SGS Colombia Carries Out Storage Tank Inspection for Cartagena Refinery
SGS Colombia was in charge of the inspection of storage tanks during the expansion works for the Cartagena Refinery.
08/24/09 Industrial Contract for the inspection of 550 km high voltage electric power transmission lines won on a public tender
Every year, the Government of Catalonia arranges independent third-party inspections for a number of power transmission lines to assure that operators are providing appropriate maintenance.
08/24/09 Industrial Technical Due Diligence for a Pipeline Project in Chile
Citigroup contracted SGS to perform technical due diligence to ensure the quality and status of their potential investment and to evaluate the technical feasibility of the projected operations of the GasAtacama Pipeline over a period of 14 years.
08/04/09 Industrial SGS Nederland BV Successfully Performs Non-Destructive Testing for BP Europoort
Based on a competitive tender process, BP, one of the world's largest energy companies, chose the Industrial Division of SGS Nederland BV for the performance of Non-Destructive Testing on all installations in their entire refinery at Europoort.
07/28/09 Industrial Technical Due Diligence of Sky Power´s New Wind Turbine
To identify and minimize technical risks in the process of buying the Fuhrländer 1.5 MW wind turbines manufactured by AAER, Sky Power Corporation, Canada’s leading independent renewable energy company awarded the contract to SGS to carry out Technical Due Diligence for the wind turbine technology.
  1 - 2 - 3 - 4 - 5  
Send this page  | Print 
Terms of Access, Privacy, ©1997-2009 SGS SA